Guangxi Hongsheng Mechanical Equipment Limited Company
Products
Contact Us
  • Contact Person : Mr. Zhao Matt
  • Company Name : Guangxi Hongsheng Mechanical Equipment Limited Company
  • Tel : 0086-771-4807911
  • Fax : 0086-771-4807911
  • Address : Guangxi,Nanning,No. 76, Baisha Avenue
  • Country/Region : China
  • Zip : 530031

Crawler Bullodzer TYS165-2-HBXG

Crawler Bullodzer TYS165-2-HBXG
Product Detailed
Related Categories:Bulldozers
Crawler Bullodzer TYS165-2-HBXG -Crawler Bullodzer TYS165-2 -Tilt dozer 18.3T -4.5 cubic meter capactiy -Weichai Engine WD10

Crawler Bullodzer TYS165-2-HBXG

Main Features of Crawler Bulldozer TYS165-2

1. TYS165-2 Bulldozer is track-type model which utilizes semi-rigid suspension, hydraulic drive and control.

2. It can be used in road building, hydroelectric construction, field modification, port and mine development and other constructions.  

3. TYS165-2 bulldozer is characterized by high efficient, open view, optimized structure, easy operation and service with low cost and reliable entire quality.

4. It is equipped with Engine Model C6121ZG (the technology of Caterpillar), super wide track, and seven track rollers.

5. TYS165-2 bulldozer is applicable for earth handling in road construction, desert and oil-field working, farmland and port construction, irrigation and electric power engineering, mining and other engineer conditions.

Main Specifications

Specifications

Dozer type

Tilt

Overall dimension (LxWxH)   (mm)

5585x4222x3190

Operation weight (kg)

18300

Ground pressure   (kPa)

28.3

Track gauge (mm)

2300

Min. ground clearance  (mm)

382.5

Gradient (°)

30 /25

Dozing capacity (m3)

4.5

Blade width (mm)

4222

Max. Digging depth (mm)

400

Engine

Manufacturer

Shanghai Diesel Engine Co., Ltd

Model

C6121ZG

Flywheel power (kW)

121

Rated Rotation Speed (r/min)

1900

Fuel consumption (g/kW · h)

≤ 224

Max. Torque (N.m/rpm)

790/1400

Implement hydraulic system

Max. System pressure (Mpa)

12

Pump type

Two group gears pump

System output (L/min)

190

Torque converter

3-element 1-stage 1-phase.

Transmission

Planetary, power shift transmission with three speeds forward and three speeds reverse, speed and direction can be quickly shifted.

Steering clutch

Multiple-disc oil powder metallurgy disc compressed by spring, hydraulic operated.

Steering brake

Brake is oil two-direction floating band brake operated by mechanical foot pedal.

Final drive

The final drive is double reduction with spur gear and segment sprocket, which are sealed by duo-cone seal.

Undercarriage system

Type

Swing type of sprayed beam

Suspended structure of equalizer bar

Number of track rollers (each side)

7

Number of carrier rollers (each side)

2

Pitch (mm)

203

Width of shoe (mm)

1070

 

Crawler Bullodzer TYS165-2-HBXG



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.